5,298 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Engineered enclosure system for roof and overhead protection of adjoining equipment and spaces
New 23 story building with roof
Installation of solar panels on roof. no change in use, egress, or occupancy.
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Installation of +/-112 feet high x +/- 16 feet wide temporary supported scaffolding & stair tower, as per plans, for exterior partial roof replacemen / reapir work. no change in us…
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Rooftop solar installation. no change to use, occupancy or egress.
Localized masonry restoration, waterproofing installation, lintel replacement, and window sill replacement as per plans filed herewith. no change to use, egress or occupancy.
Herewith filing for the replacement of an existing non-structural 4-inch concrete slab located in the front yard, directly fronting manton street and waterproofing around brick wal…
Roof exterior mock-up proposed. no change to use, occupancy or egress.
Scaffolding and needle beams installation at the exterior facades and supported scaffold inside the elevator and stair shafts from the 3rd floor to the roof level.
Replacement of split hvac system on in the basement, floor 001, floor 002, floor 003, floor 004, and the roof. no change to egress, use, or occupancy.
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
APPLICATION FILED HEREWITH FOR INTERIOR RENOVATION WITH FACADE, ROOF SHINGLES, PLYWOOD, RAFTERS,WINDOWS AND INTERIOR PARTITIONS REPLACEMENT TO THE REFERENCED (2) TWO STORY WITH CEL…
New rooftop dunnage steel to support new mechanical equipment and miscellaneous new secondary steel framing to frame out new floor slab openings.
Proposed cafe in existing commercial space including finishes, lighting, electrical, plumbing and hvac system. proposed new storefront and new stair bulkhead at roof.no change in u…
Roof protection of adjacent properties in relation to nb application:#x01047507-i1
Installation of pv system on existing roof top. no changes to the use egress or occupancy.
A.rebuild east garage wall as per plansb.reinforce and brace roof framingc.repoint cmu wall as neededd.resolve oath/ecb violation no. 35685606re.resolve dob violations:e.a.v 091725…
Filing herewith foundation work on the cellar and structural work on the 1st through the 3rd floor and roof. no change in use egress or occupancy. filied in conjunction with applic…