5,298 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
VERIZON - Relocate/replace 6 antennas & 6 RRHs, relocate 3 MDBs, install 1 RRHs, remove 3 ballast frames, remove 4 cabinets from existing platform and install 1 new cabinet. All wo…
Installation of photovoltaic solar array on existing roof system as per plans
K050, installation of +/- 185 linear feet of chain link fence, 48 linear feet of the sidewalk shed, and scaffold (on the roof) in conjunction with dob # 322053558. no change in use…
File plumbing work type in conjunction with general construction workapplication job#b01188632-i1install new plumbing fixtures at cellar 1st thru 4th floor and roof.
Remove and replace 17 existing roof drains and Reflash 35 existing vent stacks, relocate & Reflash 5 vent stacks and extend 26 vent stacks 46 min. above roof . as per plans.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Filing herewith structura work as per plans: installation of new sub-framing and concrete pad for acid neutralization tank at 4th floor & installation of new reinforcement, sub-fra…
Is 281k - filing herewith the mechanical work asscoiated with the i-1 roof, windows and exterior masonry work. no change in use, egress or occupancy.
Installation of new VERIZON site on the roof. Install 3 sectors (12 antennas) with associated parts, 6 RRH units, 3 GPS units and 1 equipment platform with related cabinets. Relate…
Mechanical work associated with installing VRF refrigerant lines and indoor units from the cellar to the 29th floor in the corridors and home offices and connecting to condenser un…
Replacement of ex. main roofing system, membrane flashing, main rof parapet + bulkhead for evironmental bldg (e) of nycct. no change in use, egress or occupancy.
Filing herewith for the interior renovation of an existing duplex apartment with vertical enlargment at roof.
Ot-gc - filing herewith for the window, roof repairs/replacement and exterior masonry work there will be no change in egress, occupancy or use.
New 3 Gas Meter/Pipes/Valves/Controls to be installed. New 3 Gas pipe to be connected to existing 3 gas service. New Gas Booster Pump and associated piping, valves controls 4th flo…
Installation of pv system on existing roof top. no changes to the use egress or occupancy.
Installation of temporary adjacent roof protections per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this a…
Installation of solar panels on existing roof. no change in use, occupancy, or egress. no change in bulk
Installation of photovoltaic solar array on roof including all related structural work as per plans filed herewith. electrical app# b01337971-i1 filed separately. no changeto use,…
Removal of rooftop equipment for 14-story commercial building
In-kind replacement of (1) 4 ton 'coleman' outdoor rooftop unit, unit to sit on exist. dunnage on exist. roof
Installation of solar panels on roof. no change in use, egress, or occupancy.