3,420 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Propose new enlargement of an existing 2-story residential building to a new MDL Class A Apartments building. Upgrading Construction Class IB with general construction works per NY…
Herewith filed for a new 8'-0 curbcut with 1'-6 splays distance 75' to the corner filed in conjunction with New Building application X00888817-I1
Replace existing porch at the front of the building and replace the existing mud room at the rear of the building. Construct new concrete patio at the rear of the building.
Herewith Filing Temporary Standpipe in Conjunction with New Building Application X08008823.
Installation of reinforced cast in place concrete aggregate barrier wall and foundation at existing concrete plant. filed in conjunction with nb 321184534.
Temporary standpipe system filed in conjunction with nb job number m00785688-i1.
Proposed installation of temporary heavy duty pipe scaffold for new building as per plans. no change in use, occupancy, or egress under this application.
Curbcut application in conjunction with nb # 421300489.
New 6 story and cellar mixed use building
Herewith filing proposed curb cut in conjunction with nb filing x00822794 total width including splays is 10'-0
Use of Building Maintenance Unit (BMU) #2, as per plans filed herewith. This application is filed in conjunction with NB-121205604.
Proposed a new 2-story 2-family building semi-detached house.
Proposed a new 2-story 2-family building semi-detached house.
Sprinkler & standpipe work type in conjunction with nb application q08051255
Installation of temporary material hoist and its runback structure per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupa…
Hereby filing fof new sprinkler and standpipe system for new building#q00487394
Temporary hoist run-back structure during new bldg construction, filed separately. run-back structure shall comply with ch #33 of the nyc bldg code. no change in use, occupancy or…
8 feet high plywood temporary construction fence in conjunction with proposed new single family residence
Filing temporary standpipe with air pressurized alarm system in conjunction with nb #b01008423-i1.
Hereby filing for modification of existing sprinkler system, new sprinkler riser throughout. all tenant buildout work to bve filed under a seperate application. this application is…