21,183 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
partial plumbing work, new building main sewer line as per DEP approved site connection. DOB inspection for sewer line steel sleeve through foundation wall.
Plumbing work is proposed in existing unit #2 on the 2nd floor. Subsequent GC, MH, SP, and exterior applications will be filed. All per submitted plans. No changes to use, egress,…
Plumbing work at cellar filed in conjunction with renovation of 5-story nycha multiple dwelling as part of the nycha pact renovation: installation of new booster pump and hot water…
provide new sanitary facilities for office in conjunction with Alt #M01355130 as per plans filed
provide pantry sink and HWH for office in conjunction with Alt #M01367407 as per plans filed
Reconfigure basement locker rooms with new walls & doors. infill depressed slab with light weight concrete in new storage rooms 2 & 3. patch existing slab for plumbing removal. new…
Plumbing in conjuction with new building job number # b00872449-i1
Modification of plumbing system as shown on plans.
Propose interior renovation on cellar, 1st and 2nd floor. plumbing & gas works as per plan. general construction file under dob now job# s00999557-i1. no change in use, bulk, egres…
Provide exterior site drain inlets and piping to existing site storm system.
Minor demolition and general construction for interior renovation of bedroom and primary bathroom on floor 3, of residence. Architectural work to be reviewed under 1968 BC. Plumbin…
Plumbing application filed in conjunction with NB application #B00497203-I1
Proposed plumbing work in conjunction with ALT-2 Application B00576600 for general renovation of existing 3 family
Plumbing work associated with the fitout of the berriebuilding expansion
Job filed herewith of plumbing work for interior renovation of an ex. commercial 2-story structure, incl. new, replaced and relocated plumbing fixtures as per plans. no change in u…
Installation of new storm piping, water/sanitary work subsequent filing to general construction (gc) filing.
Installation of new storm piping, water/sanitary work subsequent filing to general construction (gc) filing.
Subsequent application filed herewith for plumbing work type, installation of new plumbing fixtures, coldand hot water pipes, and gas lines, in conjunction to alt job b01138866-i1
Existing 1 family building with plumbing work on thebasement, 1st and 2nd floor under this application. this job isrelated to alt2 job # b01355516-i1.2. no change in use, means of…
Existing one and a half story, one family dwelling unit to be vertically enlarged, converted into a two family dwelling units , and fully renovated . New drywalls partitions and pl…