10,715 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Installation of suspended scaffold for facade inspection/repair.
Facade repairs, scaffold inspections, 3 men letter
Interior alteration of existing 2 stories residential building and install new deck on rear yard.
Interior renovation of existing multifamily building, renovation of interior units and corridos. no change to use, egress or occupancy.
Renovations to existing retail store. removal of interior wall cladding and millwork. replace with new drywall system as per plans filed herewith. no change in use, egress or occup…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Application filed herewith for structural modifications associated w/ Alt CO; new interior stair, new elevator shaft and new penthouse addition. No change in use, egress or occupan…
General construction for interior renovation of Apartment 7E on the 8th floor as shown on drawings filed herewith. No change in use, egress or occupancy.
Suspended scaffold outrigger system for exterior facade restoration work at 135 west 36 street, manhattan, ny 10018
Removal of interior wall partitions, removal of drinking fountain and slop sink, removal of existing floor and wall tiles, and Installation of new lintels for new 4' x 8' window op…
Outriggers system installation and material hoist for facade repairs. no change in use, egress, or occupancy under this application.
Garage Repair Project as per plans. No changes to use, egress, or occupancy.
General construction for lobby renovation
Fit out to provide storage cages and areas for tenant and building management teams.project includes minor renovations, such as new lighting and ventilation, of a small archival ar…
Minor partition relocation. Kitchen and bathroom renovation.
Minor renovation to existing cellar. no change to egress, use, or occupancy.
Interior renovation of Apartment 8 construction of interior partitions, fixture and finishes. No change to occupancy use and egress.
Exterior renovation to remove existing siding & replace with new stucco finish and interior renovation of existing 2 family 2 story w/ cellar building to correct ecb violation #391…
Proposed interior alterations existing powder room converted to new full bathroom- remove/ replace all finishes fixtures as per proposed plans at single family dwelling *no change…
Propose rear enlargement (approx. 800 SF) to existing building. Interior renovation under separate Alt-2 application (Job# M01228024-l1). No overlap in scope.
Installation of a suspended scaffold for Facade and repair as per plan submitted. No change to egress or occupancy.