9,877 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Remove kitchen sink and showner with piping at cellar to cure ecb violations# 39176287z & 39176286r
Plumbing modification to existing system and alteration for new tenant fit-out
Herewith filing plumbing modifications for interior renovation (cardiology offices, conference, treatment/exam rooms and support areas). No change in use, egress, or occupancy.
Installation of new partitions for gas piping installation as per plans. Installation of new partitions and door with damper on 1st floor. No change to occupancy, use, or egress.
PL: Remove existing plumbing fixtures and provide new connected to existing system. No change in use, occupancy, or egress.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Legalize 2 bathroom fixtures in cellar
PLUMBING
Plumbing work filed in conjunction with Alteration 322065171.
Interior renovation of 3-story nycha multiple dwelling as part of the nycha pact renovation: replacement of existing kitchen and bathroom fxitures on existing rough-in. no change i…
PL: Provide New Storm Drainage System. Provide New Main water / sanitary lines for the new building.
Existing two family house with plumbing work at cellar, basement, 1 st & 2nd floor. in conjuction to job# b01330755-i1. no change in use, means of egress or occupancy.
Remove, replace or install plumbing fixtures in conjunction with GC application #B01193177-I1.
Plumbing work for commercial tenant fit-out as shown in plans.
Plumbing work filed herewith as shown on plans.
partial plumbing work for new building sewer line as per DEP site connection Approval, DOB inspection for sewer line and steel sleeve through foundation wall
Filing for plumbing work in conjunction with dob# b00499814 alt2 application for interior renovations.no change in use, egress nor occupancy.
partial plumbing work for new building sewer line as per DEP site connection Approval, DOB inspection for sewer line and steel sleeve through foundation wall.
Gp7 ped surgery: plumbing and sprinkler modifications to accommodate the pediatric icu renoavtion, greenberg pavilion, in the existing hospital building. no change to zoning, use,…
Installation of new combined water service with bfpa and fire sprinkler system
partial plumbing work for istallation of new building sewer as per DEP site connection approval, DOB inspection for sewer line steel sleeve through foundation wall.