5,066 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
New pool and spa. per la city standard plan #268.
ePlan: Backfill existing pool.
Supplemental permit to 25047-20000-00108 to revise pool equipment location
Minor interior renovation of existing commercial use group vi space including the installation of new floor & wall finishes & a new commercial kitchen as per the drawings filed her…
EPLAN Proposed swimming pool and spa per standard plan #268. 3 OF 3
EPLAN: Remodel of existing 2-story medical office building to provide new outpatient clinic. Remodel includes exam rooms, offices and support spaces. Clinic will be OSHPD-3, licens…
MPP # 157. Private Road establishment for tentative tax lot 3 with permitted (40) parking spaces.
Interior Remodel Interior remodel of an existing single-family residence consisting a kitchen and master bathroom renovation including cabinetry replacement new countertops floorin…
Excavation for new pool
Suppl. permit to 26047-20000-00243 to add zero edge and reduce pool size per standard plan #268 and engineering details
Supplmental permit to 25047-20000-00816.to change the location of the pool equipment.
NEW POOL AND SPA PER STD PLANsee comment
New 22'x16' pool and 8'x16' spa per standard plan #268
Closed Crawlspace system- Clean out crawlspace remove old insulation. Seal all vents and penetration
1st fl unit 3. remodel and expand e floor space at basement to new kitchen, new bath, spiral stair. remodel e bath and remodel e living to bedroom and e kitchen to full bath
level 00: tenant space build out for urgent care space. work includes new partitions, doors, restrooms, archorage for equipment, and finishes. mep included.
1)partial garage conversion to living space. 2) lightwell enclosure with repair stair. 3) rear patio construction. 4) space heating system replacment. 5) structural strengthening o…
Remodel portion of office space -ACW certificate of occupancy required: no special inspections required: no const type: IA 2020 MSBC Tenant: Taft Floor(s): 1 architect: Mary Hustad
sealing crawl space
Interior renovation of existing office space on the 14th floor; includes installation of interior non-load bearing partitions and finish work as per plans. No change to use, egress…