17,337 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Filing herewith for the modifications to existing mechanical systems from 7 through roof floors. There is no change to use, egress, or occupancy
Installation of solar panels on roof. no change in use, egress, or occupancy.
Installation of solar panels on roof. no change in use, egress, or occupancy.
Installation of photovoltaic solar array on existing roof system as per plans.
Installation of solar panels on roof. no change in use, egress, or occupancy.
Installation of photovoltaic solar array on existing roof system as per plans.
Remove and replace existing garage and 1st floor roofing system, facade repairs including through-wall flashing replacements, garage repairs including topside, underside, vertical…
Installation of solar panels on roof. no change in use, egress, or occupancy.
Installation of photovoltaic solar array on existing roof system as per plans
Renovation of exist. residential house, repair/replace/new partition, door, ceiling, floor, stair, painting, canopy, roof as per plan. no change in use, egress or occupancy.
Filing for mechanical work for modification of mechanical ductwork and installation of AC units for the 3rd floor and roof at the referenced address. No change in use, egress, or o…
Installation of solar panels on roof. no change in use, egress, or occupancy.
Installation of new VERIZON telecommunications site. Install 1 antenna sector (3 antennas) with 5 related RRH units, 1 GPS units & 1 equipment cabinet on the roof. This is a split…
Interior and exterior church renovation including roof, windows work, and new elevator as per plans filed herewith. no change to use, egress, or occupancy.
Installation of a 13.94kW roof mounted solar system with (34) 410w panels, (1) 7.6kw inverter and (1)5.7kw inverter. Stand alone work. No Building Permit.
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
Structural work on the roof and 12th fl as plans filed herewith. no change in use, egress, or occupancy.
Installation of photovoltaic solar array on existing roof system as per plans.
Q181_Reconstruct main entrance vestibule slab structure. Perform exterior masonry work. Remove and replace foundation wall waterproofing, main/low/bulkhead roofing systems, exhaust…
Replace detached garage roof framing. no change of use, egress or occupancy under this application.