17,454 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Replace existing roof drains
Replacement of roof drains and associated piping.
Supplemental to permit# 26014-10000-00112 to modify roof design.
Filing for a temporary mock up at the roof. No change to use, egress. or occupancy.
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Mechanical modifications on floors 1-8 and 8th Fl Roof, as per plans filed herewith. No changes in use, egress or occupancy.
Installation of roof overhead protection in accordance with nycc 2022 chapter 33 building code. no change in egress, use, or occupancy.
New detached wood frame garage. dimensions and setbacks per application. building outside dimensions: 24'-0' ' x20'-0' '. hip roof height to peak: 12'-0' '.
Installation of photovoltaic solar array on existing roof system as per plans
Repair or in-kind replacement of 0 plumbing fixtures as described in permit application. includes repair or replacment of plumbing piping. locations: 0 residential unit(s), 1 non-r…
Self-cert 2019 cbrc: replacement of three (3) existing cooling towers with 3 new units of comparable weight and size on existing main roof including associated mechanical, electric…
Structural work for new steel dunnage installation atop existing roof for new mechanical equipment as per plans filed herewith. no change in use, egress or occupancy.
Alt CO filed to combine 2nd floor dwelling units, remove and replace stair bulkhead at roof as per plans.
Decommission of existing T-MOBILE site on the roof. Initial application filed under Job No. B00081867. No change in use, egress or occupancy.
Cps school, no change in use. monarcas elementary. the work consists of: roof replacement, masonry repairs, interior repairs, mechanical equipment replacement, exterior lighting, l…
Installation of a temporarily supported scaffold, overhead and roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress a…
Installation of solar panels on roof. no change in use, egress, or occupancy.
Selective roof replacements, parapet replacements, and exterior masonry repairs, along with miscellaneous MEP work related to the aforementioned replacements.
New detached wood frame garage. dimensions and setbacks per application. building outside dimensions: 20'-0' ' x15'-0' '. gable roof height to peak: 4'-0' '.
Enclose covered porch into conditioned office space. No change to building footprint or roof height. New framing windows exterior wall infill insulation drywall finishes mini-split…