Herewith filing for mechanical modifications to the existing system on the 7th through 10th floors as per plans. no change to use, occupancy, or egress under this application.
Alteration of existing sprinkler system as per plans filled herewith. proposed sprinkler system is designed as per nfpa 13, as modified by nyc bc appendix q.
This application is filed for the interior demo work at the first floor retail store, in conjunction with alt-2 application #m01331333-i1, no structural work, no change of use, egress or occupancy.
Installation of 300psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the nyc building code 2022. no change in use, occupancy, or egress under this application.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
At 35th floor tenant space and bathrooms, removal of interior partitions, finishes, and fixtures. at bathrooms, installation of new partitions as per plans filed herewith. no change in use, occupancy...
AT 35th floor tenant space and bathrooms, removal of ductwork. At bathrooms installation of Ductwork, Exhaust Grilles and Diffusers as per plans filed herewith. No change to use, occupancy, or egress.
This application is filed for a Temporary Use Permit for a sales office and model apartments pursuant to section AC 28-111 and Buildings Bulletin 2010-002.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
At 35th floor tenant space and bathrooms, removal of interior partitions, finishes, and fixtures. at bathrooms, installation of new partitions as per plans filed herewith. no change in use, occupancy...
Remove fixtures, equipment and piping and restore existing drains in first floor commissary kitchen and locker room. Provide new underslab drainage and grease interceptor for prep kitchen fitout. Prov...
AT 35th floor tenant space and bathrooms, removal of ductwork. At bathrooms installation of Ductwork, Exhaust Grilles and Diffusers as per plans filed herewith. No change to use, occupancy, or egress.
This application is filed for a Temporary Use Permit for a sales office and model apartments pursuant to section AC 28-111 and Buildings Bulletin 2010-002.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Install temporary construction fence.
Relocate existing sprinkler heads for ceiling modifications on first floor
Restrooms - Plumbing work on the 7th floor as indicated on drawings.
Replacement of split system on floor 001 and roof. no change to egress, use, or occupancy.
Restrooms - Plumbing work on the 8th floor as indicated on drawings.
Hereby filing to install mechanical units with associated ductwork and piping for tenant buildout as shown on plans filed herewith. No change to use, occupancy or egress