Building Permits in ZIP 10065
Manhattan, NY — 376 permits filed recently
376 permits
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Modify existing sprinkler heads in coordination with the new reflected ceiling plans.
8936 - Extending existing elevator shaft to accommodate larger cab. No change in egress use group or occupancy. Pro Cert Requested.
L-4 CARDIOLOGY Phase 4 : HVAC MODIFICATIONS TO ACCOMMODATE THE PHASE 4, CARDIOLOGY, IN THE EXISTING HOSPITAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY.
L-4 CARDIOLOGY Phase 4: MODIFICATION TO INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE THE PHASE 4, CARDIOLOGY, IN THE EXISTING HOSPITAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE...
backyard Patio restoration including replace membrane and replace travertine tiles with marble tiles as per plans filed herewith. No change to use, egress or occupancy.
Disconnect and removal of existing plumbing fixtures at various locations. Furnish and install new plumbing fixtures and associated piping at various locations.
Replace existing thru-wall ac unit in Apt 6C. No change to use, egress, or occupancy.
Suspended scaffold outrigger system for exterior facade repair work at 188 east 64th street, manhattan, ny 10065
Provide new 4 floor control valve assemblies connected to existing 8 standpipe on 7 floors with distribution and new sprinkler heads.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Interior renovation, ptac unit replacement, new condenser and ptac unit below window, new air handler in apt. #3b. no change of use, egress or occupancy.
Interior renovation of residential unit on the 3rd floor. removal of non-load bearing partitions and finishes.installation of new partitons and finishes throught along with new plumbing and mechanical...
Renovation & partition reconfiguration of existing 2nd & 3rd floor. removal of housekeeping apartment on 2nd floor & conversion to business use on entire 2nd floor.
Altco filed for change of use of multiple dwelling building to a one family as per plans filed herewith.
Plumbing work in conjunction with apartment renovation (Unit 7)
Structural modifications associated with Rockefeller Research Lab (Pavilion Enabling) Parking Garage alteration. Scope to include, but not limited to, partial demolition, reinforced concrete, structur...
Plumbing fixtures instalation and associated piping as per plans filed herewith. no change to use, egress, or occupancy.
Plumbing work related to the interior renovation of apartment 15e on the 15th floor. no change in use, egress, or occupancy.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.