Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Interior renovation, ptac unit replacement, new condenser and ptac unit below window, new air handler in apt. #3b. no change of use, egress or occupancy.
Interior renovation of residential unit on the 3rd floor. removal of non-load bearing partitions and finishes.installation of new partitons and finishes throught along with new plumbing and mechanical...
Renovation & partition reconfiguration of existing 2nd & 3rd floor. removal of housekeeping apartment on 2nd floor & conversion to business use on entire 2nd floor.
Interior renovation of residential unit on the 3rd floor. removal of non-load bearing partitions and finishes.installation of new partitons and finishes throught along with new plumbing and mechanical...
Interior renovation, ptac unit replacement, new condenser and ptac unit below window, new air handler in apt. #3b. no change of use, egress or occupancy.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Renovation & partition reconfiguration of existing 2nd & 3rd floor. removal of housekeeping apartment on 2nd floor & conversion to business use on entire 2nd floor.
Plumbing fixtures instalation and associated piping as per plans filed herewith. no change to use, egress, or occupancy.
Additions & modifications to structural members as shown on drawings. Filed in conjunction with NO WORK - ALT I BIS # 123907512. Related general construction filed under DOB NOW #M00450660. No change...
Plumbing work related to the interior renovation of apartment 15e on the 15th floor. no change in use, egress, or occupancy.
General construction and partial demolition of the Rockefeller Research Lab (Pavilion Enabling) parking garage as per plans filed herewith. No change in use or occupancy under this application. Existi...
Structural modifications associated with Rockefeller Research Lab (Pavilion Enabling) Parking Garage alteration. Scope to include, but not limited to, partial demolition, reinforced concrete, structur...
The scope of structural work for being filed herin is to provide supportfor future grade-level work onto the existing building foundations and to install framing modifications in association with the...
Altco filed for change of use of multiple dwelling building to a one family as per plans filed herewith.
Modifications/additions to existing foundation associated with the Rockefeller Research Lab (Pavilion Enabling) Parking Garage alteration as per plans filed herewith. No change in use, egress or occup...
Alteration co (type i) for change of use on the 7th floor and updated certificate of occupancy to reflect floors 1-9 and roof. this is general construction for alt i bis# 123907512.
Remove and replace existing HVAC system from basement through roof as per plans. No change in use, egress, or occupancy.
Plumbing work in conjunction with apartment renovation (Unit 7)
Structural modifications associated with Rockefeller Research Lab (Pavilion Enabling) Parking Garage alteration. Scope to include, but not limited to, partial demolition, reinforced concrete, structur...