Building Permits in ZIP 10010
Manhattan, NY — 677 permits filed recently
677 permits
Interior renovation to include demolition and construction of partitions in an existing office space. No change is use, egress, or occupancy.
Installation of 300psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the nyc building code 2022. no change in use, occupancy, or egress under this application.
Structural component of the demolition of Stair C from 11-20 and at the roof.
Herewith file plans to add fire rated chase work for the refrigerant lines. No change to use, egress or occupancy,
Renovation of existing building lobby, including finishes and entrance vestibule. Minor alterations to adjacent retail tenant storefronts. No change in use, egress or occupancy.
Modifications to existing Mechanical/HVAC System and ductwork related to Guestrooms renovation.
Installation of suspended scaffold for facade work or inspection.
New non structural partitions and millwork, flooring, dropped ceilings and finishes. pl work to be filed under subsequent document in conjunction with gc. no change to use occupancy or egress
Interior renovation to include demolition and construction of partitions in an existing office space. No change is use, egress, or occupancy.
Mechanical work as shown on plans filed herewith. No change in use, egress or occupancy.
Installation of 300psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the nyc building code 2022. no change in use, occupancy, or egress under this application.
Structural work associated with roof amenity space. no change to use, occupancy or egress
Plumbing modifications for interior renovation of Apartment 5D on the 6th floor as shown on drawings filed herewith. No change in use, egress or occupancy. OT filed separately under M00724342-I1.
East Midtown Plaza Bldg H, Phase 6 exterior FISP Cycle 9 related facade repairs as per the plans filed including: Concrete spall & crack repairs. Sheet metal and brick masonry replacement.
Installation of temporary construction fence as per plans. no change in use, occupancy or egress.
Installation of 300 psf sidewalk shed and roof protection as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Pl scope: interior renovation of units: lb, 1a, 1b+1c, 1f+1g, 1g+1h, 1l+1m, 1m+1n, 2c+2d, 2d+2e, 2f+2g, 2l+2m, 3b+3c, 3c+3d, 4f+4g, 4h+4j, 5a+5b, 5b+5c, 5e+5f, 5d+5e, 5h+5j, 5m+5n, 6e+6f, 6f+6g, 6k+6j...
Installation of temporary construction fence as per plans. no change in use, occupancy or egress.
Installation of 300 psf sidewalk shed and roof protection as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Pl scope: interior renovation of units: lb, 1a, 1b+1c, 1f+1g, 1g+1h, 1l+1m, 1m+1n, 2c+2d, 2d+2e, 2f+2g, 2l+2m, 3b+3c, 3c+3d, 4f+4g, 4h+4j, 5a+5b, 5b+5c, 5e+5f, 5d+5e, 5h+5j, 5m+5n, 6e+6f, 6f+6g, 6k+6j...