Building Permits in ZIP 10010
Manhattan, NY — 683 permits filed recently
683 permits
Replace (2) gas fired boilers
Herewith filing Fuel Oil Storage Removal in cellar. No change in use, egress, or occupancy.
Gas connection to replacement boilers.
General construction modifications taking place on the facade as per drawings filed herewith. No change in use, egress or occupancy.
Sh/jhs47m - for temporary construction equipment (shed)submitting on behalf of contractor, related to job # m00817245, no change in use,occupancy or egress
Installation and use of temporary supported scaffold as per plans filed herewith. no change in use, egress, or occupancy.
Remove and cap plumbing fixtures as per plans
Remove and cap plumbing fixtures as per plans
Installation of temporary pipe scaffold as per plans. pipe scaffold shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application.
Installation of temporary pipe scaffold as per plan. no change in use,egress, or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Interior scope, to include millwork, wood flooring, finishing. No change to use, egress or occupancy.
Installation of temporary pipe scaffold as per plan. no change in use,egress, or occupancy.
Interior scope, to include millwork, wood flooring, finishing. No change to use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
General construction modifications with interior demoliation taking place on the 8th fl as per drawings filed herewith. no change in use, egress or occupancy.
The scope of work includes the installation of outriggers as shown in provided drawings for local law masonry facade repair. no change in use, egress or occupancy under this application.
The scope of work includes the installation of outriggers as shown in provided drawings for local law masonry facade repair. no change in use, egress or occupancy under this application.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy.
Removal of sprinkler heads and plumbing fixtures.