Building Permits in ZIP 10011
Manhattan, NY — 1,115 permits filed recently
1,115 permits
Interior fit-out of existing residential unit 1g proposed. install new plumbing fixtures. no change of use and occupancy under this application.
Renovation of public hallways in res. 5 sty bldg: replace flooring, int. lighting, apt doors, paint. Repair and resurface exist. facades, scrape & paint exist. fire escape. No change in use, exits or...
Dev.Hub Consultation 10/25/23. Application filed to erect 17 story new building.
Install standpipe as per plan, application is in conjunction with nb application bis#121186448,no change in egress,occupancy,and use
Interior build-out of apartment #3. Work to include non-structural demolition, general construction, and finishes, as per plans filed herewith.
Temporary non-illuminated non-advertising accessory banner sign on protective structure for obscured sign permitted under job# m01255318 - legal as per nyc a.c. 3301.9.6 - ulta beauty. no change of us...
Interior removal of non-load bearing partitions on cellar, floors 1 through 4, as shown per plan. no change in use, egress or occupancy.
Filing for interior renovation of unit PHA (11 and 12th floors), including new gypsum board work. Mechanical and Sprinkler work to be filed separately. Mechanical work under M01334117-I1
Interior renovation in apt 1a filed in conjunction with dob no pl. no change to use, occupancy or egress.
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Filing for installation of hvac unit for apartment 17r as per plans submitted herewith.
Sprinkler work in 1st floor tenant space.
Demolition of existing mechanical equipment, ductwork and piping serving the area of work indicated on drawing plans. No change to use, egress, or occupancy.
Propose to install new illuminated channel letters on aluminum raceway for existing commercial space. no change to use, egress or occupancy.
Architectural modifications taking place on the 9th floor (9KN) as per plans filed herewith. No change in use, egress or occupancy.
Remove & replace existing cracked stone facade at 1st floor w/ new sintered stone panels installed on rainscreen system. Proposed work to replace existing cement board substrate, insulation, waterproo...
COMBINATION OF APARTMENTS 12G & 12H ON THE 12th FLOOR INTO ONE APARTMENT AS PER TPPN 3-97. REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS AND FINISHES. . ALL AS PER PLAN. NO CHANGE IN USE EGRESS OR O...
Modifications to existing mechanical systems in 17th floor office space. no change to use, occupancy or egress
Structural modifications related to 3rd floor work. No changes to use, egress or occupancy.
Modifications to existing mechanical systems in 17th floor office space. no change to use, occupancy or egress