Building Permits in ZIP 10011
Manhattan, NY — 1,106 permits filed recently
1,106 permits
Subsequent filing plumbing work under dob application# m01110984-i1 for first floor restaurant. no change of use, egress or occupancy.
Plumbing work associated with an architectural renovation of an office space on 6th floor of a seven (7) commercial use building. No change to use, egress, or occupancy.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
New 13 story building.
Install new construction fence for storefront replacement at the commercial space on the 1st floor. scope of works as shown in plans. no change in egress, occupancy or sue.
Erection of minor partitions, millwork, new lighting and new finishes throughout the cellar and 1st floor commerical space
Filing herewith Sprinkler work for the renovation of the sixth floor. No change to use, egress, or occupancy.
Plumbing work associated with an architectural renovation of an office space on 6th floor of a seven (7) commercial use building. No change to use, egress, or occupancy.
Herewith, please find the filing for interior demolition, which includes the removal of partitions, ceilings, floors, and fixtures throughout. There will be no changes to use, egress, or occupancy.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
New 13 story building.
Install new construction fence for storefront replacement at the commercial space on the 1st floor. scope of works as shown in plans. no change in egress, occupancy or sue.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Subsequent filing plumbing work under dob application# m01110984-i1 for first floor restaurant. no change of use, egress or occupancy.
Erection of minor partitions, millwork, new lighting and new finishes throughout the cellar and 1st floor commerical space
Filing herewith Sprinkler work for the renovation of the sixth floor. No change to use, egress, or occupancy.
Erect an illuminated sign on wall.not within view of arterial highway or public park 1/2 acre or more. no change in use, egress or occupancy.
Addition of one shower unit in location of an existing closet located within an existing powder room. no change in use occupancy or egress. work limited to lower level of unit #ph3/4
Material hoist
Propose to remove and install some interior non bearing partitions and install new interior finishes all as per plans filed herewith. No change in use egress or occupancy is proposed under this applic...