Building Permits in ZIP 10014
Manhattan, NY — 1,109 permits filed recently
1,109 permits
Filing for minor interior renovation at apt#7D. No change in use, egress or occupancy.
New installation of combined sprinkler and standpipe system as shown on plans, Filed in conjunction with New Building M00587493-I1
Subsequent filing for plumbing works.
Plumbing system for New building
Addition of new mer equipment for per room as per plans
Roof repair & reroofing above sheathing. no change in use, occupancy, egress, or zoning.
Installation of temporary plywood fence as per plans. no change in use, egress or occupancy.
Alteration of ductwork and piping, new Fan coil units and heat pump units as required by architectural program.
Tenant improvement of existing leased space for a BOH. Work includes non-structural partitions, ceilings, finishes, furniture and related HVAC, electrical and plumbing work. No change to use, egress o...
Plumbing modifications (foley residence renovation ph-ae) no change of use egress or occupany.
install new whsp supporting heating and future tenant cooling and install hydronic heating system as per plans
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
PL work as per plans
INTERIOR RENOVATION OF APARTMENT UNIT 3i, ON 3RD FLOOR ONLY, CONSISTING OF PARTITIONS, GWB, TILE WORK AND COSMETIC FINISHES AS INDICATED. NO CHANGE TO EGRESS, OCCUPANCY OR USE.
Relocation of AC Duct as indicated on plans. Provide two electric air curtains
Minor interior demo; Install two new demising partitions with maglock doors on the 2nd Floor as per plans (Publicis.) No change to use, egress or occupancy.
Plumbing modifications (foley residence renovation ph-ae) no change of use egress or occupany.
Tenant improvement of existing leased space for a BOH. Work includes non-structural partitions, ceilings, finishes, furniture and related HVAC, electrical and plumbing work. No change to use, egress o...
Alteration of ductwork and piping, new Fan coil units and heat pump units as required by architectural program.
Installation of temporary plywood fence as per plans. no change in use, egress or occupancy.