Filing to install outrigger on the roof for facade work.
Replacement (1) new low pressure boiler. replacement (1) new combination gas/oil burners. change grade of fuel oil from #4 oil to #2 oil. no change in means of egress use group or occupancy.
Filing for construction renovations of penthouse solarium as per plans filed. No change in use, egress or occupancy.
Installation of pipe scaffolding as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Plumbing work to include, replacement of fixtures, relocation of fixtures and new installation of fixtures. no change in use, egress or occuapncy
Installation of temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary supported scaffold per plan submitted. Scaffolding associated with the following job numbers M01194927-I1 and M01194927-S1. Work shall comply with 2022 building codes chapter...
Suspended Scaffold installation for facade repairs and inspections
Installation of pipe scaffolding as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Filing for construction renovations of penthouse solarium as per plans filed. No change in use, egress or occupancy.
Replacement (1) new low pressure boiler. replacement (1) new combination gas/oil burners. change grade of fuel oil from #4 oil to #2 oil. no change in means of egress use group or occupancy.
Installation of temporary supported scaffold per plan submitted. Scaffolding associated with the following job numbers M01194927-I1 and M01194927-S1. Work shall comply with 2022 building codes chapter...
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Suspended Scaffold installation for facade repairs and inspections
Plumbing work to include, replacement of fixtures, relocation of fixtures and new installation of fixtures. no change in use, egress or occuapncy
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Plumbing scope for initial gc job filing. existing bathroom and kitchen fixtures to be replaced. no change in use, occupancy or egress.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.