Building Permits in ZIP 10022
Manhattan, NY — 1,628 permits filed recently
1,628 permits
Mechanical work as shown on plans filed herewith. No change in use, egress or occupancy.
Propose installation of new air conditioning unit, exhaust fans, associated ductwork, louvers and piping. No change in use, egress or occupancy.
Interior renovaition, installation of new non-load bearing walls, doors, wall and floor finishes, ceilings and millwork on 8th floor office space as per plans. no change to use, egress or occupancy.
Renovation of office with addition of door on Lower Level 2 (Sub-Cellar #1 per CO). No change in use, egress or occupancy.
Plumbing Fixture changes as indicated on plans.
This application filed herewith for a temporary use permit for model apartments on the 7th floor pursuant to section ac 28-111 and buildings bulletin 2010-002. no change in occupancy, use or egress un...
Proposed exterior facade restoration as per plan herewith. no change in use, egress or occupancy.
Plumbing modifications on 13C/14M and 14C/15M floors as per plans filed herewith. No change in use, egress or occupancy.
Sprinkler work as shown on plans filed herewith. No change in use, egress or occupancy.
Sprinkler head changes as indicated on plans,
Removal and installation of ductwork, diffusers, fans, a/c, and related mechanical piping on 8th floor office space as per plans. no change to use, egress or occupancy.
Use of mechanical lift during storefront installation as per plans. no change in egress, use, or occupancy.
Plumbing modifications taking place on the 13th (12a marketing) and 14th floor as per drawings filed herewith. no change in use, egress or occupancy.
Suspended Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy.
installation of temp loop and associated piping. No change of use, occupancy or egress.
plumbing work as shown on plans herewith. No change in use, egress or occupancy.
General construction plans filed herewith to show interior alteration within tenant space ste 11 on 11th floor in existing building. no change to use, egress, or occupancy.
Plumbing modifications taking place in the cellar, 1st and 2nd floors as per drawings filed herewith. no change in use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Plumbing modifications taking place on the 13th (12a marketing) and 14th floor as per drawings filed herewith. no change in use, egress or occupancy.