Building Permits in ZIP 10022
Manhattan, NY — 1,628 permits filed recently
1,628 permits
Replace existing plumbing fixtures in Apartment #25D in associated with application #M01162139. No change in use, egress, or occupancy.
Minor interior renovation including partitions, doors, and finishes on the 34th Floor (Cohen Clair), as per plans. No change to use, egress, or occupancy.
Filing for plumbing work associated with interior renovation of 11th & 12th floors for peerless clothing as per plans submitted herewith.
Installation of new steel beams for atm machine support as shown on drawiings. no change to use, egress or occupancy.
Storefront renovation as per plans filed herewith. no change to use, egress or occupancy.
Plumbing system modification as per the plans filed herewith. no change to use, egress or occupancy.
Minor modifications of the existing HVAC system and associated ducts & piping on the 34th Floor (Cohen Clair), as per plans. No change to use, egress, or occupancy.
Interior renovation existing commercial space with plumbing work on 1st floor. no change in use, egress or occupancy.
Herewith filing to install new AC and vent systems and new kitchen exhaust system as per the drawings.
Structural work on 16th floor as per plans. No change to use, egress or occupancy.
Filing herewith drawings indicating modification of the Mechanical system on the 7th floor. No change in use, egress, or occupancy under this application.
Sprinkler system modification as per the plans filed herewith. no change to use, egress or occupancy.
Preparation Work for Full Demolition - Interior Demo
Modification/addition to plumbing fixtures and related piping as shown on drawings. No change in use, egress or occupancy.
At 28th floor tenant space, modification to existing plumbing system as per plans filed herewith. no change to occupancy or means of egress.
Interior renovation of apartment 9b as per the plans.
Preparation Work for Full Demolition - Equipment Use for Interior Demo
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS Designated Primary Site supervisor: Nicholas Kagios, Special Rigger # 7720:
Preparation Work for Full Demolition - Equipment Use for Interior Demo
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.