Building Permits in ZIP 10022
Manhattan, NY — 1,628 permits filed recently
1,628 permits
Removal and disposal of interior partitions, doors, suspended ceilings, stair and finishes on the 31st floor (Electra Usa) as per plans. No change to use, egress or occupancy.
Installation of temporary working platofrm as per plans. platofrm shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Proposed alterations to an existing condominium in an existing building- the olympic tower. apt # 36d. replacement of existing plumbing fixtures, replacement ofkitchen appliances.
Temporary Standpipe work as per plans.
Interior demo & reno of non-load bearing partitions, walls, doors, ceiling and finishes as indicated on plans.
Plumbing work for Common Fund on 22nd marketing floor (21st construction)
General plumbing work is filed to conjunct with general renovation of a existing store in a mix-used building as per plan. no change in use, egress or occupancy
Filing herewith drawings indicating the modification of the Plumbing on the 7th floor. No change in use, egress, or occupancy under this application.
Interior fit out of a portion of a multi tenant floor as shown on drawings. No change in use, egress or occupancy.
Interior renovation to existing office space. includes theinstallation and selective demolition of non load bearingpartitions and related finishes. no change in use oroccupancy.
Modification to existing sprinkler system and related piping as shown on drawings. no change to use, egress or occupanyc.
Modification to existing HVAC system as per plans filed herewith. no change in use, egress or occupancy under this application
Renovation of an existing dwelling unit. Architectural work as per plans. Partial demolition for a new facade penetration. No change of use, occupancy or egress.
Installation of pipe scaffolding as per plans. pipe scaffold shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Filing herewith drawings indicating interior renovations on the 7th floor. No change in use, egress, or occupancy under this application.
Sprinkler modifications as per plans filed herewith. No change to use, egress or occupancy.
Plumbing work for Common Fund on 22nd marketing floor (21st construction)
Renovation of an existing dwelling unit. Architectural work as per plans. Partial demolition for a new facade penetration. No change of use, occupancy or egress.
Filing herewith drawings indicating interior renovations on the 7th floor. No change in use, egress, or occupancy under this application.
Filing herewith drawings indicating the modification of the Plumbing on the 7th floor. No change in use, egress, or occupancy under this application.