Building Permits in ZIP 10022
Manhattan, NY — 1,619 permits filed recently
1,619 permits
IRA Facade inspection as per the plan
INTERIOR TENANT IMPROVEMENT OF RETAIL SALES (Accessories) AREAS LOCATED AT FIRST LEVEL. SCOPE INCLUDES NEW PARTITIONS, CEILINGS, FINISHES,SHELVING UNITS, No change in use, egress or occupancy
FILED FOR LEGALIZATION OF APTS. 4A &4B AS PER TPPN #3/97 PREVIOUSLY FILED UNDER APPLICATION # 102482528 APPROVED ON 02/23/2001 BUT NEVER PERMITTED, CREATE OPENING BETWEEN APTS. 4A & 4B, INTERIOR PARTI...
Modify plumbing fixtures and related piping as per plans. No change in use, egress or occupancy.
Mechanical work filed in conjunction with the renovation of existing dwelling unit as per plans. No change of use, occupancy or egress.
Combine apartments 36A and 36B. Eliminate one kitchen. Remove and install minor interior partition work, finishes, etc. No change in use, egress or occupancy.
Modifications to the existing Standpipe System; Relocation of two (2) Fire Hose Rack and Fire Hose Valves and associated Fire Standpipe on the 3rd Floor as per plans (Wafra Inc. - Office Renovation.)...
Install new preaction sprinkler system in the 7th Floor Server Room 07-809. No change in use, egress, or occupancy.
Installation of temporary roof protection, overhead protection and window protection as per plans. temporary protection shall comply with chapter #33 of the 2022 code. no change in use, egress or occu...
Filing for mechanical systems modification for interior renovation.
Filing for interior demo of 2nd, 4th, 13th, 22nd, and 23rd floors as per plans submitted herewith.
Filing for mechanical work associated with interior demo of 2nd, 4th, 13th, 22nd, and 23rd floors as per plans submtted herewith.
Structural design of light gage framing for new fitout.
INSTALLATION OF DUCTWORK DISTRIBUTION SYSTEMS Accessories ANDINSTALLATION OF NEW AS SPECIFIED ON PLANS HEREIN.
Filing for minor duct work in conjunction with the combination of the apartments.
At 28th floor tenant space, modification to existing mechanical system as per plans filed herewith. no change to occupancy or means of egress.
At 28th floor tenant space, modification to existing mechanical system as per plans filed herewith. no change to occupancy or means of egress.
INTERIOR TENANT IMPROVEMENT OF RETAIL SALES (Accessories) AREAS LOCATED AT FIRST LEVEL. SCOPE INCLUDES NEW PARTITIONS, CEILINGS, FINISHES,SHELVING UNITS, No change in use, egress or occupancy
INSTALLATION OF DUCTWORK DISTRIBUTION SYSTEMS Accessories ANDINSTALLATION OF NEW AS SPECIFIED ON PLANS HEREIN.
Modify plumbing fixtures and related piping as per plans. No change in use, egress or occupancy.