Building Permits in ZIP 10027
Manhattan, NY — 540 permits filed recently
540 permits
Sidewalk Shed Installation as per plans filed herewith.
Facade repairs to address local law
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Sidewalk Shed Installation as per plans filed herewith.
Proposed installation of 2 illuminated non-flashing accessory business signs. 1 sign facing w 125 st wording offices . coworking regus and 1 sign facing 5 ave wording regus offices . coworking.
Facade repairs as shown on drawings submitted herewith for LL11/98 compliance.
Installation of temporary plywood fence as per plan. no change in use, egress or occupancy.
Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed at west 130th street and rear yard elevations.
Renovation of a 4-story+cellar+basement, landmark brownstone building, built in 1910; the scope includes new partitions for new apartment layouts, new joists, new finishes & facade repairs, new doors...
Renovation of a 4-story+cellar+basement, landmark brownstone building, built in 1910; the scope includes new partitions for new apartment layouts, new joists, new finishes & facade repairs, new doors...
Installation of temporary plywood fence as per plan. no change in use, egress or occupancy.
Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed at west 130th street and rear yard elevations.
Subsequent filing for Plumbing work in conjunction with construction Alt CO as per plans
Replace existing 100% outside air air handling units along with associatedappurtenances to improve store conditions as shown on the plans. connect toexisting ductwork and hot water piping, remove chil...
Proposed filing for plumbing work.
Installation of suspended scaffold for facade work or inspection.
Installation of suspended scaffold for facade work and/or inspection. amend #2, added basket.
Filing for limited exterior repair work of building facade. No change in use, egress, or occupancy.