Building Permits in ZIP 10455
Bronx, NY — 342 permits filed recently
342 permits
Install new framing members for new stair, includes beams, columns, and footings in cellar. Misc steel for new HVAC unit on roof.
Relocation of existing HVAC equipment for new egress elements, includes HVAC units, ducts, and diffusers.
Removal of partitions and ceiling for new egress elements. New Stair from Second Floor to First Floor. New egress corridor on Second Floor and Fourth Floor with ceiling and lights. Curb Flashing for n...
Filing Structural application subsequent to primary job number X00979598-I1
Subsequent filing for structural work in conjunction to alt-co application x01057161-i1
Mechanical work as per plans filed.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Starrett Merchant
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Starrett Merchant
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Starrett Merchant
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Starrett Merchant
Installation of mult-point and swing stage scaffolding as per plan and in accordance with chapter 33 of nyc building code. no change in use, egress, or occupancy.
Installation of mult-point and swing stage scaffolding as per plan and in accordance with chapter 33 of nyc building code. no change in use, egress, or occupancy.
Filing Structural application subsequent to primary job number X00979575-I1.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Starrett Merchant
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Starrett Merchant
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Starrett Merchant
Mechanical work as per plans filed.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Starrett Merchant
Install new framing members for new stair, includes beams, columns, and footings in cellar. Misc steel for new HVAC unit on roof.
Subsequent filing for structural work in conjunction to alt-co application x01057161-i1