Building Permits in ZIP 10455
Bronx, NY — 342 permits filed recently
342 permits
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Starrett Merchant
Relocation of existing HVAC equipment for new egress elements, includes HVAC units, ducts, and diffusers.
Removal of partitions and ceiling for new egress elements. New Stair from Second Floor to First Floor. New egress corridor on Second Floor and Fourth Floor with ceiling and lights. Curb Flashing for n...
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Starrett Merchant
Propose installation of flues and combustion air ductwork, provide ventilation for boiler room, and remove breeching as per plan, filed in conjunction with X01176899-I1.
Propose to erect a new 1 story commercial building
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Starrett Merchant
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Starrett Merchant
Propose installation of flues and combustion air ductwork, provide ventilation for boiler room, and remove breeching as per plan, filed in conjunction with X01176899-I1.
Propose to erect a new 1 story commercial building
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Starrett Merchant
Installation of temporary construction fence at 595 jackson avenue, bronx as per plans. there will be no change in the use, egress, or occupancy under this application.
Installation of temporary construction fence at 595 jackson avenue, bronx as per plans. there will be no change in the use, egress, or occupancy under this application.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Starrett Merchant
Plumbing work related to renovation of take out restaurant. installation of (3) compartment sinks, one hand sink, new range, gyro presser, flat gridle, fryer, candy stove and steam table. no change of...
Plumbing work related to renovation of take out restaurant. installation of (3) compartment sinks, one hand sink, new range, gyro presser, flat gridle, fryer, candy stove and steam table. no change of...
Filing herewith for plumbing work associated with the renovation of Article 31 Medical Office Space. Work to include, but not limited to, new fixtures and related plumbing. No change in use, egress, o...
Cap and remove illegal plumbing fixtures in cellar to restore to legal condition as per plans. no change in use, egress or occupancy is involved under this application.
Filing herewith for plumbing work associated with the renovation of Article 28 Medical Office Space. Work to include, but not limited to, new fixtures and related plumbing. No change in use, egress, o...
Proposed renovation of existing apartment building. Remove all existing roofing and sheathing at main roof, and bulkhead roof. No change of use, egress or occupancy under this application. See comment...