Building Permits in ZIP 10462
Bronx, NY — 338 permits filed recently
338 permits
Installation of sidewalk shed as per plans. sidewalk shed live load 300 psf. shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy.
Fisp inspection via industrial rope access
Structural work in conjunction with demising spaces for future tenants on the first floor and cellar as per plans filed herewith. no change in use, egress, or occupancy.
Mechanical work in conjunction with demising spaces for future tenants on the first floor and cellar as per plans filed herewith. no change in use, egress, or occupancy.
Application herewith filed to include (2) new voluntary open parking spaces for existing 2-family dwelling
Sunsequent filing of plumbing (gas) work in conjunction with x01281030-i1 (roof hvac units). work includes replacement of gas meter with piping as per plan herewith. this application is superseding jo...
Structural work in conjunction with demising spaces for future tenants on the first floor and cellar as per plans filed herewith. no change in use, egress, or occupancy.
Mechanical work in conjunction with demising spaces for future tenants on the first floor and cellar as per plans filed herewith. no change in use, egress, or occupancy.
Application herewith filed to include (2) new voluntary open parking spaces for existing 2-family dwelling
Replacement of roof hvac units (york) as per plans herewith. this application is in conjunction with dob#x00354672-i1 to supersede the job. no change in use, egress, and occupancy under this applicati...
Structural work as shown on plans
Structural work as shown on plans
Facade repair, includes window lintels, window sills, mortar re-pointing and masonry cracks repair, as shown on plans.
replace spalled concrete in courtyard and boiler room. Install two new steel beams and new concrete deck with waterproofing. Provide temporary shoring for same.
This application is being filed for structural work at the subject premises for the repair of the underside interior of the ceiling slab at apt 2f, 6e,7a,7b,7c,7d,7e,7f,7g,7h &7th flr. public hallway...
replace spalled concrete in courtyard and boiler room. Install two new steel beams and new concrete deck with waterproofing. Provide temporary shoring for same.
This application is being filed for structural work at the subject premises for the repair of the underside interior of the ceiling slab at apt 2f, 6e,7a,7b,7c,7d,7e,7f,7g,7h &7th flr. public hallway...
Installation of gas meters, gas meter riser & equipment and plumbing sink
facade repairs as per plans filed herewith. no change to use, egress or occupancy.
Installation of gas meters, gas meter riser & equipment and plumbing sink