Building Permits in ZIP 10462
Bronx, NY — 338 permits filed recently
338 permits
Installation of gas meters, gas meter riser & equipment and plumbing sink
AT&T - Removal, relocation and installation of equipment cabinets on existing equipment platform on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
Proposed Foundation for proposed 2 story 2 family dwelling
Proposed Foundation for proposed 2 story 2 family dwelling
Structural modifications (vertical lift shaft enclosure) on the 1st & 2nd & roof floor as per plans. no change in use, egress or occupancy.
Proposed Foundation for proposed 2 story 2 family dwelling
Proposed Foundation for proposed 2 story 2 family dwelling
Structural modifications (vertical lift shaft enclosure) on the 1st & 2nd & roof floor as per plans. no change in use, egress or occupancy.
AT&T - Removal, relocation and installation of equipment cabinets on existing equipment platform on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
Herewith filing structural design plans for new two-story, two family semi-detached dwelling.
Herewith filing structural design plans for new two-story, two family semi-detached dwelling.
Herewith file alteration in order to erect temporary construction plywood fence.
Herewith file alteration in order to erect temporary construction plywood fence.
Remove existing removable metal storage platform installed in 2016' under dob job # 220523869. also remove existing select, non-load bearing partitions. no change in egress, use or occupancy.
Herewith filing structural design plans for new two-story, two family semi-detached dwelling.
Herewith filing structural design plans for new two-story, two family semi-detached dwelling.
Remove existing removable metal storage platform installed in 2016' under dob job # 220523869. also remove existing select, non-load bearing partitions. no change in egress, use or occupancy.
Herewith file alteration in order to erect temporary construction plywood fence.
Herewith file alteration in order to erect temporary construction plywood fence.
Installation of solar panels on existing roof structure. no change in egress,use, or occupancy.