Building Permits in ZIP 11211
Brooklyn, NY — 838 permits filed recently
838 permits
Proposed mechanical work including installation of air condition system and toilet exhaust air duct in conjunction with alt-co #b00696384 on cellar, third floor, fourth floor and roof. no change in us...
Mechanical work filed in conjunction with the combining and renovation of stores. HVAC work. Kitchen and bathroom venting. Installation of kitchen exhaust hood, blower and related duct work.
Constructnew six (6) story residential building as per plans filed
Installation of temporary engineered enclosure system as per plans. no change in use, egress or occupancy.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Propose new vertical and horizontal enlargement of existing 2-story warehouse building with general construction works as per plan. it will be upgraded to ib construction and comply with new building...
Install sprinkler systems subsequent to Job #B01119604 (Alteration) and in conjunction with Alt 1#322093756. The system is hydraulically calculated.
Mechanical work filed in conjunction with the combining and renovation of stores. HVAC work. Kitchen and bathroom venting. Installation of kitchen exhaust hood, blower and related duct work.
Constructnew six (6) story residential building as per plans filed
Install sprinkler systems subsequent to Job #B01119604 (Alteration) and in conjunction with Alt 1#322093756. The system is hydraulically calculated.
Proposed mechanical work including installation of air condition system and toilet exhaust air duct in conjunction with alt-co #b00696384 on cellar, third floor, fourth floor and roof. no change in us...
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Installation of temporary engineered enclosure system as per plans. no change in use, egress or occupancy.
Application filed herewith to install new bathroom & kitchen roof mounted exhaust ventilators w/ new CAR fire rated damper. Vacuum clean all existing duct work. Change existing shut off and air valve.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
demolition of tiles and fencing in open space
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Application filed herewith to replace baseboard room heaters, roof exhaust fans and related piping and ducts. no change in use. no change in occupancy. no change in egress. no change in bulk.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Application filed herewith to replace baseboard room heaters, roof exhaust fans and related piping and ducts. no change in use. no change in occupancy. no change in egress. no change in bulk.