Building Permits in ZIP 11201
Brooklyn, NY — 438 permits filed recently
438 permits
Reno. of exist. commercial space to create commercial spaces for the school of culinary arts & school of fashion. scope includes installation of drywall partitions & non-production kitchens. no change...
Exterior repairs: repoint deteriorated mortar joints, replace deteriorated brick, repair stone band, replace lintels, and scrape and paint fire escapes as per drawings. no change in use, egress, or oc...
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the nyc building code.live...
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Facade steel repairs and parapet wall replacement as per plans filed herewith. no change in use, egress, or occupancy
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Sprinkler work as shown on the plans.
Herewith file plumbing plans in conjunction with general construction for Apt. #50 on the 5th floor.
FACADE INSPECTION Designated Primary Site supervisor: Jesus Decola
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
Blank street-- mechanical modifications and installations for cafe remodel.
Restoration of existing facades including Masonry repair, replacement, & corner rebuilding, Parapet demo & reconstruction, Lintel replacement, Reinforcement of structural steel members, Sealant replac...
Installation of a temporary Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Development Hub Job. Initial Consultation Nov 29, 2021 @ 11:30 am. Please submit to Development Hub. Erect a new 30 story mixed-use building.
Installation of a temporarily heavy-duty sidewalk shed and supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with...
Removal/install of non-load bearing partitions, fixtures and finishes in cel, 001-003 and rof for existing nycct environmental (e) bldg. no change in use, egress or occupancy.
Installation of suspended scaffold for facade work or inspection.
Filed herewith for commercial restaurant fit out of existing retail space. no change to use, occupancy, or egress.
Plumbing work as shown on the plans.