Building Permits in ZIP 11201
Brooklyn, NY — 1,018 permits filed recently
1,018 permits
Facade steel repairs and parapet wall replacement as per plans filed herewith. no change in use, egress, or occupancy
Reno. of exist. commercial space to create commercial spaces for the school of culinary arts & school of fashion. scope includes installation of drywall partitions & non-production kitchens. no change...
Exterior repairs: repoint deteriorated mortar joints, replace deteriorated brick, repair stone band, replace lintels, and scrape and paint fire escapes as per drawings. no change in use, egress, or oc...
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the nyc building code.live...
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the nyc building code.live...
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the nyc building code.live...
Facade steel repairs and parapet wall replacement as per plans filed herewith. no change in use, egress, or occupancy
Reno. of exist. commercial space to create commercial spaces for the school of culinary arts & school of fashion. scope includes installation of drywall partitions & non-production kitchens. no change...
Exterior repairs: repoint deteriorated mortar joints, replace deteriorated brick, repair stone band, replace lintels, and scrape and paint fire escapes as per drawings. no change in use, egress, or oc...
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Installation of a temporary Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Sprinkler work as shown on the plans.
Blank street-- mechanical modifications and installations for cafe remodel.
Restoration of existing facades including Masonry repair, replacement, & corner rebuilding, Parapet demo & reconstruction, Lintel replacement, Reinforcement of structural steel members, Sealant replac...
Herewith file plumbing plans in conjunction with general construction for Apt. #50 on the 5th floor.
Installation of heavy duty sidewalk shed as per plans. no change in use, egress, or occupancy.
FACADE INSPECTION Designated Primary Site supervisor: Jesus Decola