Filed herewith for commercial restaurant fit out of existing retail space. no change to use, occupancy, or egress.
Removal/install of non-load bearing partitions, fixtures and finishes in cel, 001-003 and rof for existing nycct environmental (e) bldg. no change in use, egress or occupancy.
Plumbing work as shown on the plans.
Plumbing work as shown on plans
Modification of plumbing fixtures as per plans filed herewith. no change in use, egress or occupancy.
Plumbing work related to general construction work as per plans filed herewith.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Interior demolition and alteration including non load bearing partition, fixtures, and finishes on the basement, 1-3 third floor. all as per plans. no change in use, egress or occupancy.
This Alteration application is being filed in conjunction with Alt CO application #B01101087-I1 for the plumbing work at the subject premises. There are no change in use, egress or occupancy under thi...
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Install (4) replacement boilers as per plans. no change in use, occupancy, or egress.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of 300 psf sidewalk shed and pipe scaffold as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Filing herewith plumbing application incunjuction with apt combination. no change in use, egress, or occupancy.
Install new gas piping for (4) replacement boilers as per plans. no change in use, occupancy, or egress.
Emergency concrete repairs to the interior of an existing building in the cellar. emergency repair of existingstructural elements column #121, beams and slab at the main entrance of 125 navy walk. the...
Installation of a personnel hoist as per plans in conjunction with nb construction. no change in use, egress or occupancy under this application. hoist installed in accordance with 2022 nyc building c...
Installation of pipe scaffolding as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Interior renovation to combine apartment 2g and 2h as per plans filed herewith. related plumbing work filed as subsequent application. no change to use, egress or occupancy.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola