Building Permits in ZIP 11211
BROOKLYN, NY — 350 permits filed recently
350 permits
Sprinkler specifications filed in conjunction with gc application b01061260-i1
Installation of a temporary wooden construction fence
Installation of a temporary supported scaffold and heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with th...
Construction fence plan filed in conjunction with Alt-co job #B00663750-I1.
Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. no change in use occupancy or egress under this application. live load 300 per square feet. sidewalk shed shall com...
Installation of 300 psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no changes in use, egress or occupancy in this application.
Installation of a temporarily supported scaffold and heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with...
Roof Replacement
Interior renovation of existing eating and drinking establishment on the first floor. To change bar location. No change to use, egress or occupancy.
Mechanical work associated with conversion of building into daycare facility
Proposed plumbing work in conjunction with dob now job number b01358469-i1
Plumbing and sprinkler work in conjunction with alt ii job b01315579-i1
GEN. CONSTRUCTION OF EXIST. 2-FAMILY HOUSE ON BASEMENT FLOOR AND FIRST FL. ALL WORK AS PER PLAN SUBMITTED. REMOVE (2) CAR GARAGES UNDER EXIST. CO NO. 102184. AMEND TO (0.5) DWELLING ON BASEMENT Fl. (0...
RENOVATION OF EXIST'G APARTMENT AT 1st FLOOR. NO CHANGE USE, EGRESS OR OCCUPACNY
Plumbing work associated with conversion of building to day care facility
Mechanical work to renovate units #1b, 1d, 2a, 2b, 2c, 2d,3a, 3b, 3c & 3d from cellar to roof, no change to use, egress or occupancy.
Subsequent filing for mechanical systems in conjunction with nb b0144176-i1-gc
Proposed temporary 8' high plywood construction fence filed in conjunction with new building.
Foundation work is proposed in the cellar to replace the wood posts with new steel posts. The general construction application has been submitted. All per submitted plans. No changes to use, egress, o...
Installation of temporary overhead protection as per plans. no change in use, egress or occupancy.