Building Permits in ZIP 94105
San Francisco, CA — 256 permits filed recently
256 permits
5th & 6th fl ref pa # 2025-1112-9361 & 2025-0618-8982: install 1 rath master station, install 1 smart command boss, install 1 uninterruptible power supply, install 2 call station, install 2 monitor mo...
ste 1200 - add 1 transfer fan, relocate 1 box, add diffusers, add registers & grilles. new ductwork, air balances and relocate thermostats. ref pa 202512172039
ste 1300 - add 1 transfer fan, relocate 1 vav box and add diffusers, add registers & grilles, new ductwork, air balance, and relocate thermostats. ref pa 202512171962
ste 1215-1285 - add 1 transfer fan, add diffusers, add registers & grilles, new ductwork, air balance and relocate thermostat. ref pa 202512171960
ground fl ref pa #2025-1103-8763: add 5 relocate 28 change 1 fire sprinkler ti
8th fl ref pa #2026-0121-4206: revised mechanical & electrical for new offices created on floor. new ducts, heating & air.
install evacuation maps on 18th/f
replacing and modifying the sidewalk and abondoining an (e) subsidewalk basement. ref streetscape permit # 2025 exc- 024-3s
9 fl:revise fire sprinkler system to accommodate new tenant floor layout. relocating 78 heads and installing 114 new heads. total of 192 sprinkler heads
installation of new errc sytem.fire only.reference bpa#202410173107.
8th floor- revision to include new partitions & door hardware. ref. pa#202507140716
revision to pa #2025-0226-1137: new wall & soffit in kitchen. new soffit in bedroom & remove bathroom plumbing from scope.
remove (e) bar, island and shelves at living room. add recessed lights throughtout unit. san and refinish hardwood floors-paint throughout.
1/f suite 100: tenant improvement, plumbing for sinks, framing for partition walls and drywall, paint. electrical deferred.
deferred fire alarm submission associated with approved pa#2024-1017-3107
unit #905: bathroom remodel & interior painting.
remove and locate 1 wall mount strobe install 1 wall mount horn strobe ref#2025-0905-4708
to obtain final inspection for work approved under pa# 202010156573 & 202109239026. all work is complete.
converting existing duct to a new cellular communicator; add strobe in new conference room 3rd floor; all existing fire alarm system componenets and sequence of operation shall remain unchanged
7th floor. relocate (24) pendants. add (14) pendents. ref pa# 202511200104