Building Permits in ZIP 94121
San Francisco, CA — 299 permits filed recently
299 permits
solar permit: installing 9 solar pv modules, 450 watts per module, total no. of rating 4.05 kw. mounted: roof, ballasted: n, including 1 energy storage unit, with 13.5 kwh each in capacity, ess units...
install (n) wall sign facing street single sided illuminated for ascent athlectics called sign a
revision to pa 202405152200 @ 2nd fl - reconfigure front closet & powder room layout; (e) front door and window to remain @ the same location. no change to plumbing fixtures
reroofing with in kind materials 5a plybase & 5a moddified bitumen, no hot works.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
proposing a new aluminum sunroom attached to the existing house wall and on the existing, retaining wall. with 4 lights, 1 switch and 3 outlets wired to an existing gfci outlet
remodel of 2nd and 3rd flrs including the addition of a laundry room to each of the seven units, replacement of doors per plans, remodel of (7) kitchens and bathrooms (i.e. in each unit).
unit 1: revision to bpa 202601284734: 2nd floor: remodel (e) kitchen, remove kitchen walls, closet and fire place.
solar permit: mounted: roof, ballasted: n, including 4 energy storage unit, with 4.8 kwh each in capacity, ess units will not be closer than 3 feet | (1)limitless 15k-lv [240v] [si1-sb] + ctsa035-300a...
install 2 hardy frame panels & a grade beam @ the rear wall @ the parking level. damage to (e) steel beam was discovered and noted in markoff pest report
remodel one bathroom in-kind at the 3rd floor. remove ceiling and walls, plaster cover at the two front bedrooms and rewire, insulation drywall and paint.
to obtain final inspection approval for fire sprinkler for work approved under 201810294439. all work is complete
527, 3rd fl - remodel (e) kitchen, 1 full bath, & (1) half bath with same layou. replace 14 (e) aluminum window to vinyl window with same size & same location. add insulation per code, and install new...
2/f: remove walls between dining/living and kitchen. 3/f: remodel (e) kitchen and remove walls between dining/living and kitchen.
remodel kitchen and bathroom at 2nd floor. replace new insulation & sheet rock for living room and 2 bedroom with mineral wool
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
two story rear addition: infill lightwell on south side, reconfigure interior stairs. 1st floor add 1 bedroom , family room , 1 full bath, deck at rear. 2nd floor remodel kitchen and bathroom. 3rd flo...
revision 202201276766- remove approved spiral staircase at rear deck. add (n) french doors to 2nd floor bedroom
to obtain final inspection for work approved under pa#202411054375