Sprinkler work on the 1st floor (bike room) as indicated on drawings.
Installation of new wet sprinkler system throughout the space. no scope in standpipe. application filed in conjunction with job # m00774618
Application herewith filing for proposed plumbing work to cap & remove illegal kitchen fixtures & 1 bathtub to rectify ecb violations #39137994x & #39137995h.
Plumbing work related to the interior renovation of apartment 7q on the 7th floor. no change in use, egress, or occupancy.
Modifications to existing sprinkler system as indicated on plans. no change in use, egress or occupancy.
Maintain existing temporary loop during construction of the tenant fitout. new full sprinkler system throughout space tied in to existing sprinkler main. new sprinkler system shall…
Modification to sprinkler system as per plan no change to use egress or occupancy.
Plumbing work in conjunction with General Construction, DOB# M0114880-I1, for the interior renovation of apartment 12C on the 12th floor. There is no change in use or occupancy und…
Installation of electric hot water Boiler in conjunction with new 16-story Medical Office Building as per plans filed herewith.
Plumbing work in apartment 3c in conjunction with apt renovation in dob now job#m01314103. no change in use, egress or occupancy.
Proposed to remove standpipe and sprinkler system prior to demolition, in conjunction with full demolition Job # B01184678. No change to use egress or occupancy under this applicat…