Installation of trench drain per plans. No change in use, egress or occupancy.
Replace high pressure steam boiler.
Gas connection to replacement boiler.
Modification to plumbing fixtures and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
Install new gas service, meter and piping to existing gas burners.
Replacement of gas piping, fuel oil piping, and fuel oil pump.
Replacement of the boilers and burners, operating on dual fuel, with associated boiler equipment.
Connect to existing gas piping and gas meter for one (1) replacement boiler and gas/oil burner and one (1) new hot water boiler as per plans. install one (1) indirect hot water sto…
Removal of two (2) existing boilers and installation of two (2) two boilers in existing boiler room.
Cap/remove gas connection to eleven (11) gas boilers and replace with three boilers.
(2) new gas trains. reconnect existing low pressure gas lines, new gas fired domestic hot water heater & storage tanks. no change in means of egress use group or occupancy.