Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this applic…
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this applic…
Fence application filed in conjunction to alt1
Fence application filed in conjunction to alt1
support of excavation in conjunction with NB job number 340770669
support of excavation in conjunction with NB job number 340770669
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this applic…
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this applic…
Proposed conversion to an existing 2 story and cellarresidential building. with horizontal and vertical enlargement existing 2 units proposed total of 8 residential units.
Filing for the installation of pump jack scaffolds.
Structural and foundation work as per plan
Filing for the installation of pump jack scaffolds.
Structural and foundation work as per plan
Mechanical work on 1st, 2nd, 3rd floor & roof. no change in egress, use or occupancy.
Mechanical work on 1st, 2nd, 3rd floor & roof. no change in egress, use or occupancy.
Foundation work in conjunction with GC job B00871488-I1
Foundation work in conjunction with GC job B00871488-I1
Structural and foundation work type
Structural and foundation work type
Structural and foundation work filed in conjunction to nb application number 340770678