Acs System Associates Inc
Permits (33)
Removal and replacement of existing custom casework.
K183: Replace existing blowers with H&V units and steam heating coils. Replace existing exhaust fans with new exhaust fans. Balance airflow in spaces.
P.S. 124Q: HVAC Chiller System removal and replacement including ventilation upgrades throughout the school building. No change to Use, Occupancy or Egress
X425_Swimming Pool, Reinforcing Support Elements, and Locker Room Upgrade
X425_Swimming Pool, Reinforcing Support Elements, and Locker Room Upgrade
Installation of temporary construction fence for ps 80r at 715 ocean terrace, staten island as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Installation of temporary construction shoring for excavation as indicated on plans.there will be no change in the use, egress, or occupancy under this application.
Installation of temporary construction fence for ps 80r at 715 ocean terrace, staten island as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Installation of temporary construction shoring for excavation as indicated on plans.there will be no change in the use, egress, or occupancy under this application.
Mechanical work associated with alteration of existing building. No change to use, egress, or occupancy.
Mechanical work associated with alteration of existing building. No change to use, egress, or occupancy.
Selective demo/removal of existing ductwork/valves/controls, install (1) VRF (DOAS) Unit; (1) ERV (Recovery Unit), New Air Outlet/Inlet; New hangers, refrigerant/condensate piping, valves, sound atten...
Provide (2) Air Handling Units and associated ductwork and chilled water, steam and condensate piping. Provide (2) fans and associated ductwork. Provide (3) Split System and associated refrigerant and...
Provide (2) Air Handling Units and associated ductwork and chilled water, steam and condensate piping. Provide (2) fans and associated ductwork. Provide (3) Split System and associated refrigerant and...
Selective demo/removal of existing ductwork/valves/controls, install (1) VRF (DOAS) Unit; (1) ERV (Recovery Unit), New Air Outlet/Inlet; New hangers, refrigerant/condensate piping, valves, sound atten...
Subsequent filing for mechanical work for 3rd floor as per plans filed herewith.
Subsequent filing for mechanical work for 3rd floor as per plans filed herewith.
Trenching starting from BLDG (L) to buildings G, S, & M. And trenching from BLDGs R to T as shown on approved plans for Snug Harbor Campus Grounds for mechanical piping into the said buildings. See co...
Trenching starting from BLDG (L) to buildings G, S, & M. And trenching from BLDGs R to T as shown on approved plans for Snug Harbor Campus Grounds for mechanical piping into the said buildings. See co...
Installation of new sidewalk shed for ps 80r at 715 ocean terrace, staten island as indicated on plans. there will be no change in the use, egress, or occupancy under this application.