Installation of (1) 4 ton split system AC system located on the 2nd floor.
Installation of new (1) 2 ton air cooled and new (2) 4 ton air cooled split systems at 1st floor retail.
Installation of (3) air cooled roof top units located on the 2nd floor roof
Installation of (3) air cooled roof top units located on the 2nd floor roof
Installation of (1) 20 ton air cooled packaged rooftop system and (1) 3 1/2 ton air cooled package rooftop system on 1st floor roof.
Installation of (1) 20 ton air cooled packaged rooftop system and (1) 3 1/2 ton air cooled package rooftop system on 1st floor roof.
Hereby filing to install mechanical units with associated ductwork and piping for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.
Hereby filing to install mechanical units with associated ductwork and piping for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.
Filing herewith for Mechanical modification and installation to the existing system as per plans. No change to use, egress or occupancy.
Installation of (1) 8 ton air-cooled split system with ACCU on 2nd floor roof. AHU installed in the 1st floor IT room.
Filing herewith for Mechanical modification and installation to the existing system as per plans. No change to use, egress or occupancy.
Installation of (1) 8 ton air-cooled split system with ACCU on 2nd floor roof. AHU installed in the 1st floor IT room.
Herewith filing mechanical chiller work as per plans. no change in use, egress or occupancy
Herewith filing mechanical chiller work as per plans. no change in use, egress or occupancy
Installation of (3) air cooled roof top units located on the 1st floor roof
Installation of (3) air cooled roof top units located on the 1st floor roof