Structural changes (repairs) on the 1st floor and facade as indicated on drawings.
Removal of existing roofing system and installing new roofing system, removal of existing concrete curb at main roof, and installation of new roofing system at bulkheads and water…
Installation of temporary material hoist as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicati…
Installation of temporary material hoist on top of existing supported scaffold (filed by other) as per plan submitted. Work shall comply with 2014 building codes chapter 33. No cha…
Application file for facade repair. no change in use, occupancy or egress.