Project consists of an existing classroom of approximately 920 sf to be converted into a Mental Health Center with an office.
Replacement of the existing fire pump and controllers.
Remodel the existing Bldg J into a Jewelry Store. The work is mostly a cosmetic renovation the demolition is mainly the removal of existing lighting a
Install electrical service pole for temporary construction power ref 2026-034125 BP