Modifications and removal to existing ductwork as per plans filed herewith. No change to use, egress, or occupancy.
Interior demolition with renovations on construction floor 20 (marketing floor 24) as per plans filed herewith. No change to use, egress, or occupancy.
Proposed storefront replacement works on all existing exterioropenings at ground floor as shown on plans. no change in use, egress & occupancy
Interior office build-out on the 10th floor including partitions, finishes, ceiling work, millwork as per the architect's drawings. there is no change to use, egress, or occupancy.
Proposed interior renovation of existing health and fitness establishment with general construction works as shown in plans. no change to egress, use and occupancy.
Renovation of a commercial space including installation of new type ii commercial kitchen hood, exhaust fans, makeup air unit, water source heat pumps with ductwork, and cooling to…
Non-structural interior demolition at existing 10th floor office space. remove existing floor finishes and non-load-bearing partitions. no change in use, egress, or occupancy.
Structural work at existing first floor lobby: provide new wall opening and install new steel framing with base plate and post-installed adhesive anchors as per engineer's plans. n…
Interior 1st floor renovation with selective demolition, new non-load-bearing partitions, new door installation, ceiling adjustments, and finish work as per the architect's plans.…