Proposed interior renovation to the 1st floor, to include new finishes, new partitions, new lighting, and plumbing fixtures.
Remove, replace or install plumbing fixtures in conjunction with GC application #Q01302428-I1.
Capped Guest Bathroom and new Clothes Washer on the third floor
11B: Installation of plumbing fixtures as per plans filed herewith. No change to use, egress or occupancy
Heewith filing for modifications to the plumbing fixtures as per plans. no change to use occupanyc or egress under this application.
Installation of new plumbing fixtures and associated piping for a renovation apartment unit#22ab. no change of use, egress or occupancy under this application.
Plumbing application filed in conjunction with DOB NOW job B01278003-I1
File to remove and cap existing boiler and install 2 new tankless water heaters with existing gas valve with neutraliziing kit, drain and trap. no change in use, egress, or occupan…
Plumbing work and sprinkler work for the renovation of an existing commercial building. install new kitchen equipment, bathroom and fixtures with piping. no change of iuse, egress…
This subsequent application is filed for plumbing work for apt 5p on the fifth floor only.
New, replaced, relocated and capped plumbing fixtures and/or appliances as per Plumbing Drawings.
Plumbing modifications for apt. 7a as per plans filed herewith. no change to use, egress or occupancy