Construction equipment- sidewalk- shed proposed installation of heavy-duty sidewalk shed. no change in use occupancy or egress under this application, live load 300 # per square fe…
Application filed for roof and facade repairs as per plans. no change in use, egress or occupancy
Masonry facade repair campaign to address cavity wall ties including the installation of post-installed anchors at brick cavity wall system. No change in use, egress or occupancy.
Install (2) gas material hoists during facade and roofing work
Building exterior brick veneer anchoring to the backup cmu walls and 4 greenroof installation.
Obtain DOB approval for facade repair. Scope of work: general construction. No change in use, egress, or occupancy.
General Construction, Foundation and Structural related work for Elevator Bulkhead Extension & Systems Upgrade. Work to include excavation, masonry, concrete and steel work within…
Outrigger suspended scaffolding for facade and masonry work
install outrigger suspended scaffolding during facade repairs
Material gas hoist during facade restoration work
Construction equipment- sidewalk- shed proposed installation of heavy duty sidewalk shed. no change in use occupancy or egress under this application, live load 300 # per square fe…
install outrigger suspended scaffolding during facade repair work
Facade repairs. no change in use, egress or occupancy.
Exterior repair. No change in sue, occupancy, or egress.
Alteration type 3 - install supported pipe scaffolding as per drawings. no change in use, occupancy or means of egress.
Filing application for minor facade renovation