Sprinkler work on the 11th floor (Linklaters) as indicated on drawings.
Standpipe work on the 11th floor (Linklaters) as indicated on drawings.
minor plumbing ,standpipe & sprinkler work as per plans
Sprinkler modifications taking place on the 24th and 25th floor as per drawings filed herewith. No change in use, egress or occupancy.
Sprinkler work on the 10th floor (LB Pharma expansion) as indicated on drawings.
Sprinkler modifications, in conjunction with interior renovations, as per plans submitted herewith. No change in use, egress, or occupancy.
Sprinkler scope associated with the renovation of the existing Safe Area at Public Theater. No change of use, egress or occupancy.
Sprinkler head changes as indicated on plans.
Herewith filing for modifications (removals/new installation) of existing sprinkler system and associated piping on the 1st floor as indicated on plans.
Modification/addition to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.
Herewith filing modification to existing sprinkler system in conjunction with interior renovations of 11th floor restroom and corridor.
Hereby filing for the replacement, relocation and installation of plumbing fixtures and the relocation and installation of sprinkler heads. no change to use occupancy or egress.
Subsequent application filed for sprinkler modifications/additions on the 11th floor as per plans filed herewith. no change in use, egress, or occupancy.
Sprinkler work as shown on plans submitted herewith. No change to use, occupancy or egress as of right.
Filing herewith modification to the existing sprinkler system as per plans filed herewith. No change to use, egress or occupancy.
Relocate sprinkler heads and piping and install new plumbing fixtures and piping to accommodate alterations to the school on partial floors 2 and 5 only as per plans filed herewith…
Sprinkler modifications as per plans.
Sprinkler modifications taking place on the 2nd floor as per plans filed herewith. No change in use, egress or occupancy.
Sprinkler modifications taking place on the 6th floor (8th floor Marketing) as indicated on the drawings.