Bg Construction Ny Inc
Permits (35)
Job filed interior renovation of commercial store including new counter and cooking equipment, new kitchen hood system and fire surpression system,new floor tile and new paint as per plan. no change o...
Job filed interior renovation of commercial store including new counter and cooking equipment, new kitchen hood system and fire surpression system,new floor tile and new paint as per plan. no change o...
Filing for fence worktype, work as per plan.
Filing for fence worktype, work as per plan.
Foundation filing in conjunction with structural job # B01344356
Proposed support of excavation work filing #B00866884-Z1 in conjunction with G/C filing #B00866884-I1.
Foundation filing in conjunction with structural job # B01344356
Proposed support of excavation work filing #B00866884-Z1 in conjunction with G/C filing #B00866884-I1.
Install oil tank enclosure.
Install oil tank enclosure.
Job filed to comply with violation #s 38272546H;38272547J 1) To remove stagellift at first floor restaurant 2) Add Non-FAR enlargement adding a utility room at first floor restaurant. No change of use...
Structural work in association of B01322470-I1 Application. Job filed to comply with violation #s 38272546H;38272547J 1) To remove stagellift at first floor restaurant 2) Add Non-FAR enlargement addin...
Job filed to comply with violation #s 38272546H;38272547J 1) To remove stagellift at first floor restaurant 2) Add Non-FAR enlargement adding a utility room at first floor restaurant. No change of use...
Structural work in association of B01322470-I1 Application. Job filed to comply with violation #s 38272546H;38272547J 1) To remove stagellift at first floor restaurant 2) Add Non-FAR enlargement addin...
Structural work in conjunction with job # 310138384
Structural work in conjunction with job # 310138384
Interior renovation for community facility in cellar/basement and first floor.
Interior renovation for community facility in cellar/basement and first floor.
Replace existing ceiling and gypsum board throughout the dining area, and replace the exhaust duct and install new 4'-3wx16'-0l fire suppression system in kitchen on first floor existing restaurant. n...
Replace existing ceiling and gypsum board throughout the dining area, and replace the exhaust duct and install new 4'-3wx16'-0l fire suppression system in kitchen on first floor existing restaurant. n...