Mpp-191: filing herewith installation of sprinkler system in conjunction with interior renovation of daycare space as per plans. no change in use, egress, or occupancy.
Herewith filing plumbing work to replace all plumbing fixtures for apartment 3A and 3B
Plumbing work associated with interior renovation of Apartment 7B.
Plumbing work on second floor: new washing machine, replaced toilet and vanity, removed bathtub and replaced with shower, replaced kitchen sink and new dishwasher.
Replace and relocate plumbing fixtures to new locations, as per plans. No change in use, egress or occupancy in compliance with Technical Policy and Procedure Notice #3/97
Install standpipe system as per plans filed. No change to use, egress oroccupancy. Filed in conjunction with NB#.
Interior renovation associated with the sprinkler scope. no change in use, egress or occupancy
Plumbing/combine work in apartment 10de in conjunction with apt renovation in dob now job#m01325394. no change in use, egress or occupancy.
Install new plumbing sprinkler system for new 6-story residential building subsequent with nb job#q01076570.no change in use,egress and occupancy.
Sprinkler work filed in conjunction with dob now gc and mh on the 2nd thru 5th fl. no change to use, occupancy or egress.
Respectfully request to file Post Approval Amendment (PAA P2) for word change (Back-flow Preventer location- Cellar. No change in use, egress, or occupancy.
Tenant fit out: Installing plumbing fixture to accommodate new layout. Modification the existing sprinkler layout to accommodate the tenant fit out
Filing to replace 2 tank hwh with new 2 wall mounted hwh as per plans, no change in use occupancy or egress.
Remove, relocate and install new plumbing fixtures and related piping.
Filing pl for the demolition, removal, and reinstallation of existing risers and pl fixtures for bathrooms