Mechanical work for student service building , project is to modify the existing hvac and lighting system as per plans. no change to use, egress or occupancy
Remove and replace and install new AC Units as per plans submitted herewith.
Filing herewith for the foundation work type
Remove and replace existing HVAC system from basement through roof as per plans. No change in use, egress, or occupancy.
Remove and replace existing HVAC system from basement through roof as per plans. No change in use, egress, or occupancy.
Herewith filing to replace split-system air conditioning units, cooling coils and upgrade HVAC controls as per the drawings. No change in use egress or occupancy
Filing herewith to provide electrical closet for relocated equipment., an elevated steel framed boiler room,and a natural gas optional standby power generator on steel platform.
Herewith filing to replace split-system air conditioning units, cooling coils and upgrade HVAC controls as per the drawings. No change in use egress or occupancy
Filing herewith to provide electrical closet for relocated equipment., an elevated steel framed boiler room,and a natural gas optional standby power generator on steel platform.
Structural dunnage support for RTU on roof.
repair and replace existing ac dunnage on portion of roof. No change to use, egress or occupancy under this application
replacing of hung ceilings in portion of first floor and mech penthouse to accommodate new ductwork layout and new lights. Replacement of a portion of roof for installation of new…
repair and replace existing ac dunnage on portion of roof. No change to use, egress or occupancy under this application
replacing of hung ceilings in portion of first floor and mech penthouse to accommodate new ductwork layout and new lights. Replacement of a portion of roof for installation of new…
replace existing hvac split systems in mech penthouse. Replace mechanical piping and replace ductwork in portion of first floor. No change to use egress or occupancy under this app…
Structural dunnage support for RTU on roof.
Disconnect and remove roof mounted Cooling Tower and provide new Chiller with structural base, new heat exchanger, air cooled condenser on roof. New Air Handler unit. Associate duc…
Disconnect and remove roof mounted Cooling Tower and provide new Chiller with structural base, new heat exchanger, air cooled condenser on roof. New Air Handler unit. Associate duc…
Remove Gypsum board ceiling, framing and existing access panels as necessary to replace / install new fire dampers.
Remove Gypsum board ceiling, framing and existing access panels as necessary to replace / install new fire dampers.