Herewith filing to produce bid and construction documents for the plumbing systems of the 6th floor generator replacement project at NYU Langone Orthopedic Hospital at 301 E 17th S…
OR#4 Modification to medical gas piping to accommodate renovation of Operating room 4 partial 4th floor in the existing hospital.
Northwell Forest Hills Hospital: Laboratory Equipment Make Ready & Replacement project: modify Plumbing system to conform with new hospital program as per plans filed herewith.
INVOLVES RELOCATION OFPLUMBING EQUIPMENT as per plans filed herewith. No change in use, egress or occupancy under this application.
Modifications to the existing Plumbing and Sprinkler systems on the 4th floor. No change in occupancy, use or egress.
Filing herewith the plans for plumbing and sprinkler modifications as submitted. No change in egress, use, or occupancy.
Or6: modification of medical gas piping connected to the operating room boom.
Northwell Health LIJ Medical Center: Separation of Branches ECCC Phase: modify existing plumbing, sprinkler and standpipe systems to conform with new lay-outs as per plans filed he…
Wcm interior 2 & 3: plumbing, sprinkler, standpipe modifications to accommodate the renovations in the existing building. no change to use, egress or occupancy.
Plumbing Modifications as shown on plans filed herewith. No change in egress, occupancy or use.
Nyu - ambulatory surgery center - plumbing modifications according to plans filed herewith. no change to use, egress or occupancy.
Remove and install new plumbing fixtures and piping including medical gas piping; associated sprinkler work; all work on partial 3rd floor to accommodate the MRI Suite renovation a…
Filing for the removal and installation of Plumbing & Medical Gas fixtures and associated piping.
Demolish existing sanitary, vent, acid waste, acid vent, and domestic water scope, located underground and in the basement. Install new sanitary, vent, acid waste, acid vent, and d…
Nyu langone health - acc 16 cardia rehab reno p2 filing - modifications to an existing sprinkler system as per plans filed herewith. no change in use, egress, or occupancy.
SB 4thFl: Sprinkler, plumbing and standpipe modifications to accommodate alterations at partial 4th floor as per plans.
New domestic water piping, including backflow, softener, & associated appurtenances to be provided. Trench drain to be replaced. A new air compressor on the floor below will be pro…
Modifications to plumbing and sprinkler systems as per plans filed herewith. No change of use, occupancy or egress.
Nyu langone - science building fish quarantine reno - plumbing modifications as per plans filed herewith. no change in use, egress, or occupancy.