The scope of work of this project involve providing sprinkler heads for the conveyor along the wall and sprinkler heads below duct work two feet wide and larger with sprinkler head…
Subsequent filing of sprinkler work as per plans in conjunction with nb job #b01012866.
Application filed for installation of sprinkler heads as per plans. filed in conjunction with alt 22, no change in use occupancy or egress
Remove existing water service and provide & install new combined water service for new proposed two family house . provide and install new fire sprinkler system from the combined w…
Modification to an existing sprinkler system.
Application filed for sprinkler modifications/additions on the 11th floor (darrow) as per plans filed herewith. no change in use, egress, or occupancy.
Installation of a wet-type sprinkler system including a fire booster pump and jockey pump and controllers, flow switches and tamper switches including a 4 fire water service line a…
filed herewith installation of sprinkler heads and associated piping. no change of use, occupancy or egress.
Relocate and install new sprinker heads in cel-009 and roof bulkhead in existing commercial building. no changes to use, egress, or occupancy.